Erosion Control on Construction Sites

Following a few basic principles will keep the silt on the site without costing you an arm and a leg

1 MIN READ
Following a few basic principles will keep the silt on the site without costing you an arm and a leg Sediment is being discharged into this stream (inset) because the stream banks were not stabilized by seeding and mulching or other erosion-control measures, which should happen immediately after grading. “Under the threat of court injunction, the Acme Corporation and its contractor agreed to stop work on a condo project until proper erosion-control measures are installed.” This type of news story is now a familiar sight in daily newspapers in Vermont and other New England states. In the past few years, water-pollution concerns have shifted from failed septic- systems to discharges of sediment into state waters. The focus has shifted due to the

Register to download and view this article

Get your copy

About the Author

About the Author

No recommended contents to display.