Rot-Resistant Deck Details

For a deck that lasts, seal cut ends, space deck boards far enough apart, and reduce places where leaf litter can collect

12 MIN READ

Rot-Resistant Deck Details – Continued

Attaching Ledgers

Another common building practice is to use flashing to keep moisture from getting between the house and ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above. Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone, because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

There are many ways to deal with this problem, but whatever you do, you still need to flash the connection. The simplest method is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once they’re installed. The flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face.


Another option would be to space the ledger off the building so that there is a minimum 1/2-inch gap between the ledger and the wall. Most debris will fall through a 1/2-inch gap; any leaf litter that doesn’t can be cleaned out. (Since it’s impossible to eliminate every single collection zone, we tell clients that if they want the deck to last, they will need to maintain it by removing any leaf litter that collects.) This type of connection is trickier than it looks, so we hire an engineer to design it to support the necessary loads (see “Load-Tested Deck Ledger Connections,” 3/04).

Deck Boards

Many carpenters use 16-penny nails to space deck boards. This creates a 1/8-inch-wide gap that forms a perfect collection zone between boards and on top of every joist. It’s nearly impossible to remove leaf litter from such a narrow gap. Once the organic matter gets in, it will start to rot the deck boards and the joists below. Some contractors think they don’t have to worry about this because they use redwood or cedar decking. Unfortunately, decking is no longer made from old-growth lumber. Most of the deck boards you can buy now contain a lot of sapwood, which, unlike heartwood, has very little resistance to rot.

The way around this problem is to install decking with a larger gap. We never use a gap less than 1/4 inch wide; a 3/8-inch gap is preferable. Organic matter will not collect in the larger space, but will fall through. Where it does collect on top of joists, the space is wide enough to be raked clean with a screwdriver or deck-cleaning tool. The larger space also allows air to circulate and dry out the decking and structure below.

The same rules apply to composite decking such as Trex. Captured organic matter may not affect the deck boards, but it will pile up on and rot the framing below.

Placement of boards. It’s amazing how much leaf litter will fall through a 1/4-inch gap and land on top of a beam. It’s good practice to plan where the decking will land and position beams and joints so they are not directly under a gap. Another way to minimize this collection zone is by running the deck boards at a 45-degree angle to the framing and beam. Less leaf litter will land on the beam because the gaps that pass over it will be farther apart.

Maintenance. We tell clients to maintain their decks by washing them with a deck-cleaning product like Defy TimberWash or Sun Frog Deck Cleaner (see “Sources,”). I recommend doing this twice a year after major pollen events, which in this area land in October and March.

Wood decks should be stained and sealed to prevent sun damage and to repel moisture. To increase absorption, this work should be done during the driest months of the year. We use Wolman F&P Finish and Preservative, Sun Frog Deck Sealer, or one of the TWP deck and furniture finishes.

Wood Railings

Many carpenters install 2×2 balusters by nailing them to the rim joist and then lapping over them with a fascia. This is easier than other methods, but it’s poor practice, because it creates two rot zones, one where the baluster hits the rim and another where the baluster hits the fascia. There are so many nails in the rim that it ends up looking like a pincushion. The large number of fasteners can split the balusters or rim and allow water to get into the wood.

To prevent rot, it’s better to install posts every 5 feet or so and span between them with rails that support the balusters. Avoid notching posts, but if a post must be notched where it hits the rim, the notch should extend high enough to lap onto the deck boards. This is better than butting deck boards into the side of the post, because it takes what would have been a vertical crack and turns it into a horizontal one that debris has a hard time getting into. Lap or no lap, the joint between the post and decking should be sealed with caulk.

Pressure-Treated Lumber

The substructure of a deck needs to survive the harshest conditions, so in most cases it should be made from pressure-treated lumber. Currently, alkaline copper quat (ACQ) is the most common chemical for pressure-treating wood. Pressure-treated lumber is graded on the basis of how much chemical preservative is retained by the material. Retention is measured in pounds per cubic foot (pcf); the higher the pcf of preservative, the better the lumber will be able to resist rot. With ACQ, standard practice is to use .25 pcf material above ground, .40 pcf material for lumber that will be in contact with the ground, and .60 pcf material for pilings and marine applications.

To be on the safe side, we frequently frame substructures with .60 pcf lumber. Even so, there is no guarantee that the structural members won’t rot. This is because the chemicals are unlikely to penetrate all the way through the material, especially large structural members like 4x4s, 4x6s, and 4x8s. This problem is more common on the West Coast, where hem-fir is used, but it can also happen with southern yellow pine.

To help the chemicals penetrate more deeply, the pressure treaters incise (cut slits in) the surface of the lumber. But wood expands and contracts as it gains and loses moisture, and this can cause cracks to open and admit water and organic matter to areas that aren’t preserved. Under certain conditions, the lumber will rot from the inside out.

Sealing cuts. There’s not much you can do about checking and cracking, but you can protect the untreated wood that is exposed when you drill or cut pressure-treated hem-fir. We treat cuts with a liquid preservative that contains 9 percent copper naphthenate. There are many such products on the market. Two of the better-known brands are Jasco Termin-8 Wood Preservative and Wolman Wood End Cut Preservative. We brush this material onto all end cuts and into any holes we drill in the wood.

Untreated lumber. Pressure-treated lumber is not very attractive, so there are times, especially for upper-level decks, when we use untreated lumber for beams. You should do this only when there will be enough airflow to discourage the growth of rot.

To prevent the material from rotting, we take a couple of precautions. First, we contaminate the food source by treating the wood with a borate product such as Tim-bor. Frequent wetting may cause the borate to leach out of the wood, so it’s necessary to coat borate-treated surfaces with a water-repellent sealant.

We also create a moisture barrier by sealing the top edges of joists and beams with strips of torch-down roofing material. Torch-down roofing is designed to stand up to UV rays and will self-seal where nails penetrate it. We make the membrane stick by heating it with a torch, and produce a drip edge by allowing it to project about 1/2 inch beyond the edges of the lumber. Grace Construction Products recently introduced a product designed specifically for this purpose, Vycor Deck Protector.

Other Details

Lumber won’t rot if you keep it dry. We try to keep posts up off the ground by installing them on piers formed with Sonotubes. The piers extend 6 inches above grade; to prevent moisture from wicking up the post, we seal the lower end with torch-down roofing material. We also use this material to seal the top ends of posts, especially when they’re made from untreated lumber.

It’s important to create opportunities for airflow under low-level decks. If the design calls for skirting, we enclose the area below with open lattice or vertical boards with gaps of at least 3/4 inch between them. To encourage airflow, we space the deck boards 3/8 inch apart. When the deck is low and air circulation is limited, we frame the substructure with .60 pcf treated lumber.

Kim Katwijkis a deck builder in Olympia, Wash.

Sources

Defy TimberWash

(deck cleaner)

SaverSystems

800/860-6327

www.saversystems.com

Sun Frog

(deck cleaner, stains, and sealers)

Sun Frog

800/488-3764

www.sunfrog.com

Termin-8

(end-cut solution)

Jasco Chemical Corp.

888/345-2726

www.jasco-help.com

Tim-bor

(borate preservatives)

Nisus Corp.

800/264-0870

www.nisuscorp.com

TWP

(stains and sealers)

MFG Sealants

800/297-7325

www.woodsealants.com

Vycor Deck Protector

(self-adhering membrane)

Grace Construction Products

617/876-1400

www.graceconstruction.com

Wolman F&P

(stains, sealers, and end-cut solution)

Wolman Wood Care Products

800/556-7737

www.wolman.com

Register to download and view this article

Get your copy

About the Author

Kim Katwijk

Kim Katwijk is an internationally known deck designer and builder with 45 years of construction experience ranging from heavy commercial building to log home construction.However, his true love is designing and building decks—which he has done for the past twenty years. Kim is known for his articles in Professional Deck Builder Magazine as a contributing editor for the past 11 years. Kim and his wife, Linda have also published feature articles in The Journal of Light Construction and Fine Homebuilding. He teaches The Deck Clinic at Deck-Expo and JLC Live shows and has taught several “how to” classes in South Africa, Canada, and other national trade shows.Kim established Deck Builders, Inc. in 1996. He lives in Olympia, Washington, has been happily married for 38 years, and is the father of 10.

No recommended contents to display.

Upcoming Events